
1972
Outfitting classes, clubs, teams and organizations since
8
STAGES OF PRODUCTION FROM FIRST CALL TO DELIVERED GOODS
150
UNITS PER STYLE (TYPICAL MINIMUM). LOOSER ON LARGER CAPSULES.
2x
Quenby Cullen Williamson Award for Best Costume
.png)
Product Development
-
Custom fabrics and trims
-
Prototyping and sampling
-
Fit development and size grading
-
Cost engineering
WHAT WE DO
Our Services
We build custom apparel and accessories for classes and clubs, teams, universities, whole organizations. Every project comes together differently, so the list below is everything we provide to you to ensure you have the best experience possible.
Creative
-
Theme development
-
Mood boards
-
Custom artwork
-
Repeat patterns
-
Access to our network of artists

Design
-
Garment and accessory design
-
Mock-ups
-
Styling pieces into complete looks
-
Fabric and material guidance
-
Novelty trims, embroidery, custom labels
_edited_edited.jpg)
_edited.jpg)
.png)
Planning & Fulfillment
-
Strategic planning and budgeting
-
Customs, tariffs and delivery negotiation
-
Shipping to individuals or to one location
-
Freight and storage
-
Inventory management and load-in training for your crew
-
On-site coordination before your event
HOW IT WORKS
TYPICAL PROJECT PROCESS
Our production process has 8 phases.
Every project moves through the same eight, grouped into four stretches of work. Most run 4-9 months end to end, though that shifts with how much we’re building from scratch.
Click any phase to see to what happens in it.
CONSULTATION
Maybe you’ve got a theme. Maybe you’re weighing four. Either way we start with a call and brainstorm from there.
We’ll help you land a theme if you don’t have one, then build the mood board and the vision for the whole capsule. That board does a second job too. It gets the rest of your committee pointed the same direction.
DESIGN
We draft, revise and finalize artwork that fits your theme, either in house or through our network of artists. Bring your own and we’ll develop that instead.
Once the artwork’s settled and each garment has a direction, we mock up every piece. You get to see how the art actually sits on the thing before anyone commits.
SAMPLE
We choose fabrics, materials, and trims together. Then we run strike-offs: your artwork printed onto the actual cloth it’ll live on.
Full pre-production samples, in the correct sizes, made for your approval. Fit and construction get settled here. Not after.
PRODUCE & DELIVER
Every garment approved, we move to production and lock in your delivery date.
We handle customs, tariffs and freight. Shipping goes to individuals or to one site, your call. We hand-deliver plenty of it, too.
ONCE WE'RE WORKING TOGETHER
How We Run A Project
Most of the people we work with are doing this on top of a full-time job. We've created a Clubhouse Portal to handle everything in one place and utilize easy to access & use tools so you can move efficiently with decisions and leave the rest to us.
1
Enter Portal
Artwork, files, contracts, payments, order building. All of it lives in our Clubhouse portal. Nothing important gets buried in an email thread.
2
Weekly Calls
A standing check-in on what’s next and to stay up to day on cost & quantities, plus a shared Slack channel for everything that doesn’t warrant a call.
3
Shared Calendar
All project milestones sit on a shared calendar and the reminders get sent straight to you. Dates never slip past anyone.
WHEN TO START
Shipping & Timelines
Certain dates are non-negotioable in order to ensure that you recieve samples on time and that you lock in shipping rates. We provide Google Calendars to keep you organized.
Air Freight
DEADLINE TO START PROJECT: 2-3 months out
This option is best for those who got a later start and missed sea freight deadlines. This has a higher cost and carbon footprint.
Best for | Groups that got organized closer to the date |
Requires | A later artwork deadline. Forgiving if you got started late |
Carbon | Quite a bit higher than sea |
Cost | Higher per garment |
Sea Freight
DEADLINE TO START PROJECT: 4-6 months out
This option is best for those who started with plenty of plan time, want to save money, and cut their carbon footprint.
Best for | Groups that start planning well ahead of their date |
Requires | Concepts and artwork locked earliest. This is the route that needs a head start |
Carbon | Up to 95% lower emissions per garment than air |
Cost | Meaningfully cheaper per garment |
WHERE YOU COME IN
Starting Points For Where You're At
Our system is designed to meet you where you're at in the custom apparel process. Our production process is 8 stages from idea to delivery, but many people come somewhere in between. Choose where you're at and we'll pick up from there.
When We Say Custom, We Mean Custom




GRAB OUR CASE STUDIES
From Concept to Production
Grab our case studies for a deeper look at our process from start to finish and to see some of our custom work.
.png)
.png)
.png)

SUBMIT A PROJECT REQUEST
Ready For Gear Your Group Will Obsess Over?
Tell us about your group and your vision. We'll follow up within 1–2 business days — and if you're ready to talk it through, you can book a call from there.